Welcome: Dongguan Winfine Group Co., Ltd

Home > Quality Assurance

Quality assurance is an integral part of the Winfine's important process. Strict product inspection takes place from incoming material to production and out-going.


Plastic injection control process
Following steps are defined at working station
1. First-article inspection on critical dimensions and comparison with approved sample.
2. A visual inspection performed by our trained line workers.
3. Parts are inspected one time for each 2 hours at station by IPQC
4. Finally, the acceptable parts are boxed, counted, and inspected again by our IPQC before they were moved to warehouse. And then, the parts are ready for shipments.


Mold making control process

Winfine has trained engineering team and tooling masters to supervise each mold making process.
1. The mold steel certificate and report will be provided.
2. The FAR will be provide.
3. The mold inspection report will be provide before shipments.


Our quality & facility certification includes

ISO 9001
ISO 14001
ISO 13485


CONTACT US

Name: Kerry Zhang

Mobile:+86 13686040421

Tel:+86 0769 33355233

Whatsapp:86 13686040421

Email:kerry@winfine-group.com

Add:Room 503, 5th Floor,Fangzhong Building, No. 55, Dongcheng Avenue, Xingtang Community, Guancheng street, Dongguan City


Scan the qr codeClose
the qr code