Welcome: Dongguan Winfine Group Co., Ltd

Home > News > Industry news > Did you encounter the issue of short sho…

Did you encounter the issue of short shot during injection molding ?

Did you encounter the issue of short shot during injection molding ?

Here is the reason analysis and solution for your reference.

The short shot means the insufficient filling. It refers to partial incompleteness at the end of the injection plastic flow or partial filling in a multi-cavity mold, especially the thin-walled area or the end of the flow path area. It is manifested that the melt condenses before filling the cavity, and the molten material is not fully filled after entering the cavity, resulting in a lack of material in the product.

What causes short shot with injection molding?

 

The main reason for the short shot is that the flow resistance is too large, so that the melt cannot continue to flow. Factors affecting melt flow length include: part wall thickness, mold temperature, injection pressure, melt temperature and material composition. These factors can lead to short shot if not handled properly.

 

Hysteresis effect also known as stagnation.

If there is a relatively thin structure, usually a rib, etc., at a position close to the gate, or perpendicular to the flow direction, then during the injection molding process, the melt passes through this position, it will encounter a relatively large forward resistance, while in the flow direction of the main body, due to the smooth flow, the flow pressure cannot be formed. Only when the melt is filled in the main body direction or enters the holding pressure will it form a sufficient pressure. The stagnation part is filled, and at this time, because the position is very thin, and the melt does not flow without heat supplement, it has solidified, thus causing short shot.

 

How to solve the shot shot issues during injection molding ?

1. Material

Increase the fluidity of the melt

Reduce the addition of recycled materials

Reduce gas decomposition in raw materials

2. Mold design

The location of the gate is designed to fill the thick walls first to avoid stagnation, which can lead to premature hardening of the polymer melt.

Increase the number of gates and reduce the flow ratio.

Increase runner size and reduce flow resistance

The venting position is set properly to avoid the phenomenon of poor exhaust (see whether the short shot position is burnt)

Increase the number and size of venting

Increase the design of slag well to discharge cold slag

The distribution of cooling water channels should be reasonable to avoid causing the local temperature of the mold to be low

3. Injection Machine

Check whether the check valve and the inner wall of the barrel are severely worn, which will lead to serious loss of injection pressure and injection volume

Check whether the feeding port has material or whether it is bridged

Check whether the ability of the injection molding machine can meet the molding requirements

4. Injection Mode Condition

Increase injection pressure

Increase injection speed, enhance shear heat

Increase injection volume

Increase barrel temperature and mold temperature

Increase the melt length of the injection molding machine

Reduce the buffer amount of the injection molding machine

Extended injection time

Reasonably adjust the position of each injection section and the corresponding speed and pressure

5. Part design

The design of the wall is too thin

There are stiffeners which cause stagnant flow

There are large differences in the thickness of the parts, causing stagnation in the local appearance, which can not be avoided by mold design

The action to solve the short shot issues:

Increase the thickness of the stagnation part, and the thickness difference of the parts should not be too large. The disadvantage is that it is easy to cause sink marks;

2) Change the gate position to the end of the filling, so that pressure is formed at this position;

3)Reduce the speed and pressure during injection molding, so that a thick solidified layer is formed at the front of the material flow in the early stage of filling, and it is considered that increasing the melt pressure is a commonly used measure;

4) Use materials with good fluidity.


CONTACT US

Name: Kerry Zhang

Mobile:+86 13686040421

Tel:+86 0769 33355233

Whatsapp:86 13686040421

Email:kerry@winfine-group.com

Add:Room 503, 5th Floor,Fangzhong Building, No. 55, Dongcheng Avenue, Xingtang Community, Guancheng street, Dongguan City


Scan the qr codeClose
the qr code